Repository navigation
Date the 2027.1.0 changelog for the release - #72
Merged
Merged
Conversation
The five additions of the 2027.1.0 epic are merged, so the version's section gets its date and a short intro, which release.yml requires of a stable tag. It also lists the gateway's 404 for a path refused mid-download, which the Physical step added. Refs #64
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
What and why
Step 6 of the 2027.1.0 epic (#64): every item is merged (#66, #67, #68, #69, #71), so
CHANGELOG.md's 2027.1.0 section gets its date, whichrelease.ymlrequires of a stable tag, and a short intro. It also lists one fix the Physical step made and the changelog missed: the gateway answers 404, not 500, when its provider refuses a download's path between its info and its bytes.After this merges: tag
v2027.1.0-rc.1on it, approve thenugetdeployment, check the prerelease restores from nuget.org, then tagv2027.1.0the same way (docs/releasing.md).Plan
docs/plans/2026-10-12-2027-1.md, step 6.Tested by
Docs only. CI runs every suite on the commit that will be tagged.
Review
Trivial: a date, an intro paragraph and one changelog line. Read against the merged PRs: every consumer-visible change of #66–#71 has its line.
One-way doors
None.
Refs #64